News
» Go to news mainIMPORTANT PARKING LOT CLOSURE
If you park in the Rosina lot on Sexton campus please note that paving will take place from Tuesday, August 1 until Saturday, August 5.
The paving will be done in two phases so that half the parking lot will still be available. The half closest to Morris Street will be done first. We apologize for the disruption, but expect there will be more available spaces at the end of the project when the lines are painted to maximize the space.
听
FURTHER CONSTRUCTION ANNOUCEMENTS
Also note that effective Monday, 29 July 2017,听the East side door (the one facing the quad that goes to alumni lounge) of D building will be closed to normal traffic. 听The closure is due to safety concerns.听
This door will remain useable as an EMERGENCY EXIT ONLY. 听People wishing to exit may do so via the North door of D (onto the roadway), or via N building.
The closure is expected to remain in effect until 2 September 2017.
Thank you for your understanding.听
Recent News
- Justin D鈥橢ntremont鈥檚 Work Term with The LEGO Group
- Honouring a legacy: The Mo El鈥慔awary International Student Bursary
- Meet Emran Billah: A visionary engineer building a better world
- Blending the magic of engineering at the happiest place on earth
- Hands鈥慜n Learning in Action: Students Gear Up for Peter Gregson Robotics Design Competition
- 2024 Engineering Golf Tournament
- Dalhousie Honours Dr. Ted Hubbard for Excellence in Educational Innovation
- Empowering youth and transforming communities: Celebrating International Women in Engineering Day